Introduction
Production, which is subject to the most stringent efficiency and short travel time requirements, requires smooth material flows. A plan for increasing production capacity at a regional factory belonging to a global OEM is to automate the delivery of material for the complex assembly hall in order to increase the performance of the material supply system.
IndustrieHansa impressed the customer into making it the project partner with its intelligent proposals for solutions and implementation.
Solution: Planning and realization of an automatic material delivery system and implementation of a totally new transport system in a multi-storied assembly hall.
Puncture points
- Producing materials handling concepts with cycle time studies and execution details
- Producing and updating the equipment layouts
- Integration planning of materials handling
- Coordination with the departments involved
- Construction management
- Project control
Benefits
By using state-of-the-art materials handling concepts, IndustrieHansa achieved shorter cycle times and a significant reduction in manual logistics work. Thanks to the precise planning provided by the IndustrieHansa team, series operation could be continued during implementation without any interference or any reduced output.
back